the same housing comes back as another completion

CallumBrooks0795 · 7 Dec 2025, 15:51 UTC

Closed
CA
CallumBrooks0795
Our UR5e monitor adds a completion on reconnect even though the PLC was already holding that housing's finished state. I can link the housing record, but not yet show which attempt the retained flag describes. I want to fix the accounting without guessing that clearing the flag is recovery.

2 replies

AD
AdaAbbott0042
Replying to CallumBrooks0795

Have the controls and application owners trace the retained completion to an attempt identity and its recorded disposition. Test repeated delivery and restart with the history retained. A known housing alone does not distinguish its original check from a reviewed retry.

10 points
CA
CallumBrooks0795
Replying to AdaAbbott0042

That is the missing link. The export has housing identity but no separate attempt reference. We are retaining the ambiguity and specifying the interface change, not using the next reconnect to manufacture a new completion.

7 points