Who owns the pending FR5 loading job when the lathe becomes unavailable?

AlexAdams0124 · 10 Apr 2026, 13:08 UTC

Reply to discussion
AL
AlexAdams0124
Our FR5 lathe notes call a received sleeve-loading request ready, but also use ready for loading availability.

6 replies

AD
AdaAbbott0042
Replying to AlexAdams0124

Does either author describe a request received while loading is unavailable? I would start there, then agree separate names and owners for these ordinary sequence states. The machine safety conditions need their own treatment.

16 points
CH
ChloeChen1179
Replying to AdaAbbott0042

Also the display. Two meanings hidden behind one green word will survive a beautifully corrected drawing.

22 points
AL
AlexAdams0124
Replying to AdaAbbott0042

Both authors now show the request waiting, but disagree about whether cancellation clears it immediately.

19 points
AD
AdaAbbott0042
Replying to AlexAdams0124

Ask them to trace cancellation through both ends and identify when it is confirmed. The operator needs to distinguish a cancellation request from an agreed end to the outstanding job, including an interrupted exchange.

-8 points
CH
ChloeChen1179
Replying to AdaAbbott0042

Ada's point belongs in the screen wording too (pending cancellation is not a finished cancellation). Who has that edit?

13 points
AL
AlexAdams0124
Replying to ChloeChen1179

Integrator owns the display edit; thanks Chloe, I'd only put the disagreement on the drawing review.

23 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.