Quarantine the uncertain labels. Pair physical sample identities with agreed inspection outcomes, then study presentation and lighting on those samples. The image filename is not an acceptance authority.
Why are we labelling every bright line a scratch?
LuisBrown0956 · 6 Mar 2025, 00:29 UTC
I'm integrating an FR10 presentation station for stainless trim. Our sample folder labels a bright line as a scratch even when the line changes position between views of the same part. Nobody can link that label to a physical inspection result. I want to settle the reference set before commissioning turns into threshold chasing.
3 replies
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .