We're planning presenting reflective components for surface inspection, with Fairino FR10 presenting a reflective aluminium bezel to a fixed camera in a precision metal-parts inspection area. Bright streaks move with small presentation changes in our example images, but people keep calling them scratches. We haven't commissioned the cell. How do I sort the references and imaging before we tune thresholds around this mess?

18 replies

CH
ChloeAli0222
Replying to CarlaBennett0749

Check whether the suspected scratches were confirmed on physical samples under the agreed appearance procedure. Link each image to its sample identity and inspection result first.

4points
CA
CarlaBennett0749
Replying to ChloeAli0222

Some labels came from the pictures alone. We still have the samples, but those labels aren't tied to physical inspection results. That's irritatingly circular

11points
CH
ChloeAli0222
Replying to CarlaBennett0749

Mark those labels uncertain and have the samples inspected properly. Then compare images with presentation and lighting controlled; the moving streaks are a useful reflection clue.

2points
GR
GraceArcher0407
Replying to ChloeAli0222

That clue needs a limit: presentation can also change how a real scratch appears. Movement in the image isn't enough to reclassify the sample as acceptable.

6points
CH
ChloeAli0222
Replying to GraceArcher0407

Correct. I meant a reason to investigate the imaging, not a new defect label. Physical acceptance stays with the agreed inspection method.

11points
BE
BethAllen0324
Replying to ChloeAli0222

@ChloeAli0222 Should uncertain images be treated as acceptable, or kept somewhere separate while their status is established?

17points
CH
ChloeAli0222
Replying to BethAllen0324

Retain their sample identities and undecided status. They shouldn't become confirmed acceptable or defective examples while the physical review remains unresolved.

21points
CA
CarlaBennett0749
Replying to ChloeAli0222

Our two comparison folders changed exposure and presentation together. I can't tell which change made the images look better. That comparison needs a caveat too

17points
BE
BethBrooks0846
Replying to CarlaBennett0749

I had a separate inspection setup where the 'better lighting' folder used easier samples too. Its name implied a lighting conclusion that the comparison didn't support.

8points
CA
CarlaBennett0749
Replying to BethBrooks0846

What did you keep beside each image? I can manage sample ID and settings, but I don't want a form nobody fills in

20points
BE
BethBrooks0846
Replying to CarlaBennett0749

On my setup we kept sample ID, exposure, lighting arrangement and presentation condition. Enough to explain a comparison without reconstructing the whole session from memory.

12points
CH
ChloeAli0222
Replying to BethBrooks0846

Use those details to ask your vision specialist for controlled comparisons on representative surfaces. Keep the sample set fixed when assessing an acquisition change.

19points
BE
BethAllen0324
Replying to ChloeAli0222

Could using a learned inspection model remove the need to resolve the lighting variation?

5points
CH
ChloeAli0222
Replying to BethAllen0324

It still needs trustworthy labels and representative evaluation. A different model doesn't establish whether your reference scratches are real or your acquisition comparison is fair.

12points
GR
GraceArcher0407
Replying to ChloeAli0222

Keep physical sample identity in mind when forming evaluation sets. Different images of a sample used for tuning don't provide an independent sample-level evaluation.

2points
CA
CarlaBennett0749
Replying to GraceArcher0407

I'll keep all images of one sample together when we split tuning and evaluation sets. Our file names alone wouldn't have caught that overlap

20points
CA
CarlaBennett0749
Replying to CarlaBennett0749

I've settled the review method: physical reference checks plus controlled image comparisons. That answers where to start; whether our inspection concept is suitable still depends on the resulting evaluation

6points
CH
ChloeAli0222
Replying to CarlaBennett0749

That gives the evaluation a sound question to answer. Suitability remains dependent on those checks, as you've made clear.

2points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.