We're considering Fairino FR10 for machine fixture loading with a short steel blank in a compact machining workshop, with 71 planned. The sketch reaches the fixture. Trouble is, we left out the gripper body and open door.
I'd like to check access properly before choosing an arm.
@AdaBrooks0825 Use that measured layout to review the complete approach and retreat offline. Include the tool, cables and service access, then ask the integrator to assess a revised mounting arrangement.
@TheoArcher0410 Measured access review first, then an arm decision. I've settled on that route; choosing the arm depends on a workable full-tool layout and qualified assessment.