Our shipping-carton layer rotates preferred bearing areas above gaps. I want packaging and tooling reviewing the same FR10 arrangement, including the last cartons. Which combined view should start that discussion?
Show the packed carton's required support over the layer below and pallet, then the tool placing, opening and withdrawing beside existing cartons; one common revision should also state allowed partial loads and dispatch conditions.
Packaging has the bearing sketch, while tooling's drawing stops at the carton outline. I've requested their shared view and included the partial-load question. No pattern accepted yet.
Has either owner identified a limiting position now, Henry? The shared view will be useful only if their actual findings and remaining questions stay beside it.