The FR10 screenshots name the coupon routine but not its revision or the called checks. I have asked the integrator for the matching program set. How should I tie those files to the fixture assumptions in the handover?
Integrator supplied the inventory but one called routine is still absent from the export. I've returned that specific gap. No point calling it a complete handover because the top-level screenshot matches.