The bracket only looks right while our old fixture is holding it

JoFixtures · 16 Aug 2026, 02:39 UTC

Reply to discussion
JO
JoFixtures
I'm reviewing old support-bracket records for our FR5 proposal and the fixture seems to get all the credit for alignment while correction gets no explanation; how do I separate fit-up, locating and final acceptance before we inherit that routine? Records review only, no live welding tweaks.

15 replies

NI
NinaBrown0936
Replying to JoFixtures

Find out what aligned means on those sheets before treating it as a dimension. A fixture can hold an assembly in a plausible shape while the final released requirement is something the note never measured.

11points
OM
OmarBarnes0578
Replying to NinaBrown0936

Check that the released inspection identifies its support arrangement and drawing revision. Without those, even the numerical result is hard to compare with the proposed acceptance method.

10points
NA
NaomiBaker0506
Replying to JoFixtures

And don't let a final pass price the correction worker out of the proposal when that pass followed their work.

25points
JO
JoFixtures
Replying to NinaBrown0936

Aligned is a tick against fixture seating, not a numerical reading; the released failure has values, and the accepted sheet follows a correction signature on the same traveller.

8points
PA
PavelChan1049
Replying to JoFixtures

Then you have a corrected route in the record. Doesn't mean the fixture was useless, but it doesn't show that the new robot can deliver those accepted dimensions without the missing operation.

6points
NI
NinaBrown0936
Replying to JoFixtures

Who signed the correction? If they're available, take the original sheets to them with quality rather than ask a general question about what people used to do.

7points
JO
JoFixtures
Replying to NinaBrown0936

They're still here, and quality has the request to go through that traveller with them; no explanation back yet.

25points
OM
OmarBarnes0578
Replying to JoFixtures

Incoming preparation is also missing from the account. Is fit-up recorded before the seating tick?

18points
NA
NaomiBaker0506
Replying to PavelChan1049

Could you estimate correction effort from the old labour entry meanwhile? Even a range might show whether omitting it changes the proposal.

6points
NI
NinaBrown0936
Replying to NaomiBaker0506

Naomi, only if that labour entry actually isolates correction. A shift total with several operations in it would give a very confident-looking wrong estimate.

8points
JO
JoFixtures
Replying to NinaBrown0936

No incoming measurements and no separate correction time, only the shift total; I've marked both missing, rather than distribute hours across brackets and pretend that answers it.

20points
PA
PavelChan1049
Replying to JoFixtures

You can still list the correction as an unpriced dependency. Missing time doesn't make it free, and it doesn't require inventing a number today.

14points
NA
NaomiBaker0506
Replying to NinaBrown0936

Agreed, Nina; I'd assumed a separate entry, which Jo doesn't have. Keep it unpriced until there's a basis.

11points
JO
JoFixtures
Replying to PavelChan1049

Proposal now separates the recorded corrected route from the intended uncorrected output; quality and fabrication have the gaps to review, with no fixture change selected from this little stack of ticks.

15points
OM
OmarBarnes0578
Replying to JoFixtures

Keep the pending explanation attached to that revision. The clearer description is useful, but the correction method and current-study requirements remain unanswered.

21points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.