Request the complete installed project with revisions and supported backup instructions, then trace a plate through called routines, expected process signals and approved recovery. Have another maintainer follow it.
reference-plate inspection handover stops at the FR5 main routine
MeiBaker0516 · 1 Aug 2026, 06:54 UTC
I'm trying to improve our FR5 fixture-inspection handover while the original integrator is still available. It's mostly pendant pictures with no revision, showing the main routine but not called programs, fixture assumptions or ordinary PLC signals. What would let the next maintainer follow the installed reference-plate job?
2 replies