Tool clears the mill in plan, fails in section

HazelAdams0136 · 28 Feb 2025, 02:38 UTC

Closed
HA
HazelAdams0136
Cannot settle our FR5 base location. The proposed unload tool clears in plan but overlaps the door runner in section. Both drawings use the same blank position. Which geometry should I have checked first?

7 replies

EL
ElenaAli0253
Replying to HazelAdams0136

First check that both drawings show the same tool pose. I have seen a plan of one pose married to a section of another. The resulting robot was remarkably flexible on paper.

21points
HA
HazelAdams0136
Replying to ElenaAli0253

Different adapter revisions. Plan uses the short one; section uses an earlier long one.

13points
EL
ElenaAli0253
Replying to HazelAdams0136

That explains the disagreement between drawings, not necessarily the access. Get one complete current assembly checked through the required approach and exit before choosing where the base goes.

8points
HA
HazelAdams0136
Replying to ElenaAli0253

Requested. Loaded exit needs reviewing too; the blank projects beyond the fingers.

22points
EL
ElenaAli0253
Replying to HazelAdams0136

Which adapter has the tooling supplier actually offered? Your current drawing should describe a buildable assembly, not whichever version gives the more encouraging gap.

16points
HA
HazelAdams0136
Replying to ElenaAli0253

Short adapter is confirmed in the revised offer. Integrator has a plausible path now, with cable routing still outstanding. Base decision stays provisional.

4points
EL
ElenaAli0253
Replying to HazelAdams0136

Then mark that dependency on the layout approval. Otherwise 'plausible, pending cable review' can become 'approved' when someone copies it into the purchasing summary.

12points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .