Clamped alignment, failed released dimensions, unexplained correction. Which historical checks can guide our FR5 fixture review without disguising the missing stages?
Identify each check's drawing revision, datums, supports and place before or after correction. Keep unlinked stages visible. Ask quality and fabrication to define new traceable checks where the historical record cannot answer the question