I'm preparing our fixture-based inspection handover for Fairino FR10 in a training inspection station preparing a handover, using a reference plate. The notes are mostly pendant screenshots without revision details. They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals.
I need a usable structure while the original integrator is still available.