Our robot handover is mostly screenshots (Fairino FR10, fixture-based inspection)

JasperBarnes0551 · 29 Aug 2026, 15:42 UTC

Reply to discussion
JA
JasperBarnes0551
I'm preparing our fixture-based inspection handover for Fairino FR10 in a training inspection station preparing a handover, using a reference plate. The notes are mostly pendant screenshots without revision details. They show the main routine but omit subprograms, fixture assumptions and expected ordinary PLC signals. I need a usable structure while the original integrator is still available.

3 replies

PR
PriyaChen1177
Replying to JasperBarnes0551

Can you match the installed revision to a controlled export first? That tells you which program the handover needs to describe

23 points
JA
JasperBarnes0551
Replying to PriyaChen1177

I've matched our installed revision to an export. Some screenshots belong to an older copy, though. That explains the names that weren't lining up.

7 points
PR
PriyaChen1177
Replying to JasperBarnes0551

Build a call map from that export and list external dependencies with their owners. That should give maintenance what it needs to follow the program

14 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.