Our UR5e handover screenshots say complete beside the inspection request. The operator sheet calls that accepted. Nobody has included the subprogram that decides what complete means, and both documents are being handed to the next tutor as current. I want the integrator to walk us through one actual plate before this becomes another inherited mystery.
Plate inspection handover with two versions of complete
OscarBrooks0793 · 18 Jan 2026, 23:44 UTC
1 reply
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .