I already need the full tool and door in our FR5 comparison. For this brass-blank job, the receiver adds another problem: it occupies the fixture-removal route. No, not the blank's route. The whole fixture.
We had a receiving bench proposed as movable furniture until its contents and connections were listed. It became a changeover operation with its own constraints. If relocation is suggested here, have somebody describe the complete task before treating it as free space.
Then the receiver change has answered one problem, not made the proposal ready. The actual connection and door still have to fit with the held blank; a line drawn through the handle is not a clearance.
Keep the agreed collection arrangement available while that is revised, so the next tool version does not quietly put the receiver back in the trolley route.
It is on the combined drawing. Supplier proposes a different connection arrangement; tooling is checking its complete assembly and the effect on the load assessment.
Original fitting removed from the proposed spare list. No revised assembly accepted yet. The receiver move remains useful, but I cannot close the access comparison.