Which released bracket figures can our new UR5e fixture plan actually use?

RobinAllen0338 · 26 Jun 2026, 03:00 UTC

Reply to discussion
RO
RobinAllen0338
I can separate restrained and released checks now, but this bracket history still hides the correction before final acceptance; which of its figures can guide our UR5e welding-fixture plan without inheriting that unexplained work?

10 replies

AD
AdaAdams0129
Replying to RobinAllen0338

First identify what each figure describes, including measurement condition and whether correction had already occurred. A final accepted dimension may be genuine while still being unsuitable evidence of what the welding fixture alone achieved.

3 points
RO
RobinAllen0338
Replying to AdaAdams0129

The final dimensions are identified to brackets, but the restrained note is a batch-level tick and the correction entry gives neither operation nor individual bracket IDs.

5 points
RE
RebeccaArcher0430
Replying to RobinAllen0338

Then the person estimating the new process needs that distinction beside the final readings, because an accepted part is useful evidence but it doesn't tell them how much work someone did to get there.

6 points
HE
HenryBell0612
Replying to RobinAllen0338

I would not discard the final readings. Keep them as final readings. The gap is the route to them, not whether every old measurement is worthless.

-10 points
AD
AdaAdams0129
Replying to HenryBell0612

Henry, yes. Robin can use them to show the achieved final condition under the recorded inspection method, while declining to attribute that result to the proposed fixture or an unrecorded sequence.

9 points
RO
RobinAllen0338
Replying to AdaAdams0129

Quality checked the inspection-method references and retained the final measurements as historical acceptance evidence, but the fixture designer has removed them from the column labelled first-pass results.

10 points
RE
RebeccaArcher0430
Replying to RobinAllen0338

That column change matters, Robin, and I'd ask whoever priced the correction allowance to see it too; otherwise the drawing can improve while the cost sheet carries on believing the old story.

18 points
HE
HenryBell0612
Replying to RebeccaArcher0430

Has the planner already allowed time for correction, or was it missing completely?

10 points
RO
RobinAllen0338
Replying to RobinAllen0338

Henry, there is a general rework allowance but no identified operation or frequency behind it; Rebecca, I have marked that allowance provisional for the planner rather than treating it as measured process time.

4 points
RO
RobinAllen0338
Replying to RobinAllen0338

We agreed an identified through-stage measurement sheet for the next bracket trial, including any correction before final inspection, so the old records have a bounded use now but the new process estimate still needs that trial evidence.

14 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.