I have kept the pickup edit history and the sleeve contact drawings for this FR10 transfer, but the retained clip shows the lean beginning before lift; I want the fitted assembly checked rather than assume another point correction is due.
Compare the retained sleeve's source seat and both finger contacts before and during closure, with maintenance checking the actual backing and mounting against the intended assembly. Keep a known earlier sample if available.
Earlier and current sleeves retained; both sit correctly before closure in the maintenance comparison, then one finger makes contact first. The fingers have matching face references but their backing stacks look different
Have tooling establish whether that difference is specified before removing anything. Matching loose faces do not necessarily mean matching assembled contact positions, but the drawing needs to answer what was intended.
Drawing calls for equal backing; one side contains an extra packing piece absent from this job's assembly record. Maintenance is tracing its reason before restoring the specified arrangement
Include the pickup changes in that review. Once the geometry is restored, the old compensations may no longer describe the intended grip, even if they made the uneven assembly appear usable.
Packing belonged to a previous temporary repair, not the released sleeve setup; maintenance restored the specified backing and the programmer is reviewing the edits. The complete pickup-through-release comparison is still outstanding
Keep the replacement instruction tied to that released assembly. A note saying extra packing removed will not tell the next maintainer which backing combination actually belongs there.