We're planning defining dimensional control for bracket welding with Fairino FR10 on a fabricated gusseted mounting bracket in a precision fabrication quality department. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?
My sheets contain both restrained and released results, with some conditions unlabelled. Although the drawing specifies the dimension, the inspection procedure doesn't clearly define the supports.
Ask quality and the design owner to establish the intended acceptance condition, then group historical results by their documented measurement state to support comparison.