Our steel-blank unloading proposal puts the FR10 wrist beside the open mill door, but it leaves off both the handle and gripper body. I can get the machine dimensions (the handle is definitely there). What else should go into the next layout request?
I measured it and sent a dimensioned photograph with the tool drawing. The supplier has moved the proposed base away from the handle, but hasn't returned the full route check yet.