Our FR10 loading sketch omits the door handle and tool rear

AnilArcher0375 · 29 Dec 2025, 05:34 UTC

Closed
AN
AnilArcher0375
Our short steel blank reaches the fixture on paper. The FR10 sketch omits the tool rear and actual open-door handle. I need those defined before the proposed position is costed as settled.

6 replies

HA
HazelAdams0136
Replying to AnilArcher0375

Ask for the complete loaded tool and measured door envelope in one route assessment, including release and empty withdrawal. Keep the missing inputs named in any provisional price.

21 points
AN
AnilArcher0375
Replying to HazelAdams0136

The tool body exists in a separate drawing. Rear connections are still undecided. The door sketch uses an approximate opening, not a measurement.

10 points
CL
ClaraArcher0350
Replying to AnilArcher0375

Our actual handle survey spoiled a withdrawal that looked comfortable on the old sketch. Get the machine owner to measure yours while the tool supplier defines the rear candidates. Then somebody can compare real alternatives instead of making the empty spaces fit each other.

21 points
AN
AnilArcher0375
Replying to ClaraArcher0350

That is the request now. We have not chosen an arm position or authorised the stand. The current price remains provisional.

25 points
HA
HazelAdams0136
Replying to AnilArcher0375

Does the survey include the setter's access and fixture-change route at that position?

4 points
AN
AnilArcher0375
Replying to HazelAdams0136

Yes. The setter has been asked to mark those on the measured machine layout. No survey result yet.

4 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .