Our short steel blank reaches the fixture on paper. The FR10 sketch omits the tool rear and actual open-door handle. I need those defined before the proposed position is costed as settled.
Ask for the complete loaded tool and measured door envelope in one route assessment, including release and empty withdrawal. Keep the missing inputs named in any provisional price.
Our actual handle survey spoiled a withdrawal that looked comfortable on the old sketch. Get the machine owner to measure yours while the tool supplier defines the rear candidates. Then somebody can compare real alternatives instead of making the empty spaces fit each other.