Which load cases belong in our FR10 housing-tool comparison?

LeahCarter1017 · 28 Mar 2026, 02:26 UTC

Reply to discussion
LE
LeahCarter1017
I have two proposals for transferring aluminium housings into inspection nests. Both quote the housing mass, but one has longer fingers and an adapter the other does not use. The hose fittings are absent from both totals. I cannot infer suitability from that comparison. More precisely, I need the tool suppliers and our integrator to agree what they are assessing: complete assemblies, held positions, movement and release. Should I request one worst-case load figure, or separate cases that remain tied to their actual geometry?

21 replies

LI
LiamArcher0403
Replying to LeahCarter1017

Ask for the assembled views first. Can you even identify which fingers each total covers?

14 points
LE
LeahCarter1017
Replying to LiamArcher0403

Only the first proposal identifies the fingers. The second says extended set without a drawing reference. I have asked for that identity before the comparison proceeds.

10 points
HE
HenryChan1047
Replying to LeahCarter1017

Separate cases if the assemblies or held positions differ. A single largest mass can conceal the longer arrangement. The integrator still needs the applicable centre-of-gravity and inertia information, with the intended motion.

13 points
TO
TobyChen1188
Replying to HenryChan1047

Include the tool after releasing the housing too. It still has to open and withdraw from the nest, and the proposed return movement may not be the same as the loaded approach

15 points
LI
LiamArcher0403
Replying to TobyChen1188

Toby, would that need its own drawing or a state in the same sequence?

8 points
HA
HarishAllen0315
Replying to LeahCarter1017

Leah, what changed between the two proposals besides finger length? Or is that still hidden by the unidentified set?

-7 points
TO
TobyChen1188
Replying to LiamArcher0403

Liam, either can work if the assembly and state remain unambiguous. I would rather see one readable sequence than separate attractive images which quietly use different adapters

14 points
LE
LeahCarter1017
Replying to HarishAllen0315

Harish, the first grips outside the housing; the second proposes entering its opening. They also place it at different depths in the inspection nest. We have not accepted either change to the nest interface.

1 points
HE
HenryChan1047
Replying to LeahCarter1017

Then agree the placement requirement before comparing their load results. Two valid assessments could still describe different jobs, and one may leave the housing somewhere inspection cannot use it.

18 points
HA
HarishAllen0315
Replying to LeahCarter1017

Does inspection accept either proposed depth, Leah?

15 points
LE
LeahCarter1017
Replying to HarishAllen0315

Inspection accepts the outside-grip proposal's seating position. The internal proposal leaves the housing above its required support. Supplier says it can revise the fingers to release lower.

16 points
TO
TobyChen1188
Replying to LeahCarter1017

Make the revised tool the basis of that supplier's assessment. I once received replacement contacts under an old kit description after the contact geometry had changed. The installed tool was fine; the spare list was describing its predecessor. It took an unnecessary stoppage to make everyone look at the individual references. Your second supplier is already proposing a different reach into the housing, so this is a good time to insist the drawing, assessment and eventual spare list all describe the same thing

13 points
LE
LeahCarter1017
Replying to TobyChen1188

Thank you, Toby. The supplier has now issued a revised assembly reference rather than continuing to call both versions extended set. The release sequence is still missing the open-finger view inside our nest.

3 points
LI
LiamArcher0403
Replying to LeahCarter1017

That missing view sounds more urgent than refining the weight total.

11 points
HE
HenryChan1047
Replying to LiamArcher0403

They can do both, Liam. Geometry is needed for the load assessment as well as clearance, so I would not split this into unrelated drawing and weighing errands.

5 points
HA
HarishAllen0315
Replying to LeahCarter1017

Has the first supplier's complete assembly information reached the integrator, including those previously omitted fittings?

18 points
TO
TobyChen1188
Replying to HenryChan1047

Henry's right. The useful deliverable is a consistent assembly and its cases, not a bag of numbers somebody else has to recognise later

15 points
LI
LiamArcher0403
Replying to HenryChan1047

Fair enough. I meant don't buy before seeing the release.

13 points
LE
LeahCarter1017
Replying to HarishAllen0315

Harish, yes: first assembly is with the integrator, including fittings and the loaded and released cases. The second supplier has finally shown its open fingers; they overlap a locating feature during withdrawal.

4 points
HE
HenryChan1047
Replying to LeahCarter1017

Keep that result attached to the second revision. If another finger shape is offered, it needs the same checks rather than inheriting the first version's assessment.

3 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.