Which old measurements can actually guide our fixture review?

PavelBrown0875 · 18 May 2026, 06:54 UTC

Reply to discussion
PA
PavelBrown0875
I'm reviewing historical records for our planned planning repeatable welding of bracket assemblies with Fairino FR5 and a fabricated gusseted mounting bracket in a small steel assemblies factory. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.

3 replies

LE
LeahAli0234
Replying to PavelBrown0875

@PavelBrown0875 Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.

14 points
PA
PavelBrown0875
Replying to LeahAli0234

My sheets contain both restrained and released results, with some conditions unlabelled. Although the drawing specifies the dimension, the inspection procedure doesn't clearly define the supports.

4 points
LE
LeahAli0234
Replying to PavelBrown0875

Have quality and the drawing owner define the acceptance condition. Group the old results by known measurement state; that should make them comparable.

21 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.