Tempted by a refurbished arm, missing the inspection details (parts tray loading)

BenChen1153 · 31 May 2026, 08:58 UTC

Reply to discussion
BE
BenChen1153
I'm considering a refurbished Fairino FR10 for parts tray loading with a small aluminum block in a compact production room because the price is attractive. Although the listing describes it as inspected, I haven't been shown what that covered. I'd like to establish which checks and records matter before I spend money on collection

21 replies

JA
JackBarnes0602
Replying to BenChen1153

What has the seller actually supplied: a condition report, replacement list, or just the listing? Those answer different questions.

18 points
BE
BenChen1153
Replying to JackBarnes0602

A replacement list. Nothing about the assemblies they left alone. Better than nothing, but 'inspected' is doing a lot of work here

15 points
JA
JackBarnes0602
Replying to BenChen1153

@BenChen1153 Ask for a report tied to this unit and an itemised package list. Make purchase conditional on a qualified condition assessment and a representative demonstration.

4 points
AD
AdaCarter0999
Replying to JackBarnes0602

Sorry, basic question: doesn't refurbished mean they checked the whole thing? I'm not sure what the label promises.

22 points
JA
JackBarnes0602
Replying to AdaCarter0999

The label alone doesn't tell you what was checked. Ask for the actual scope, results and exclusions for the unit you're considering.

15 points
JA
JackCarter1037
Replying to JackBarnes0602

@JackBarnes0602 When I bought a used arm for my setup, an itemised inventory revealed that a cable we needed wasn't included. Identifying it made the extra cost straightforward to establish.

9 points
BE
BenChen1153
Replying to JackCarter1037

The seller describes this bundle as a complete system without much detail. Would photographs of the individual items help establish what I'm actually being offered?

7 points
JA
JackCarter1037
Replying to BenChen1153

Photos helped with mine, alongside an itemised list. Have them identify the controller, pendant, cables and included software access rather than relying on the group photo.

13 points
JA
JackBarnes0602
Replying to JackBarnes0602

A successful demonstration of your handling task should address the main condition uncertainty left after the paperwork review.

23 points
HA
HazelArcher0397
Replying to JackBarnes0602

A demonstration doesn't settle the gap in the replacement list. Successfully handling something isn't a condition assessment of the assemblies that weren't replaced.

0 points
JA
JackBarnes0602
Replying to HazelArcher0397

@HazelArcher0397 Yes, i oversold it. The demo supports application suitability in that setup; it doesn't replace the qualified condition assessment you still need.

13 points
BE
BenChen1153
Replying to JackBarnes0602

@JackBarnes0602 I visited and saw normal movement and a successful transfer. We didn't see a backup restored, though. I'm keeping that blank on my checklist

14 points
AD
AdaCarter0999
Replying to BenChen1153

@BenChen1153 If there's a backup file, what else are you checking? Whether it opens?

22 points
JA
JackBarnes0602
Replying to AdaCarter0999

Whether the appropriate recovery process can restore the required configuration on that system. Have the seller and qualified assessor agree a controlled demonstration, including what access is needed.

11 points
JA
JackCarter1037
Replying to JackBarnes0602

My own handover needed an explicit check of recovery-tool access. Receiving files alone didn't establish who had permission to use the tools needed to restore the setup.

6 points
BE
BenChen1153
Replying to JackCarter1037

I'm also considering the handover's support arrangements. Should I ask for a named support route so maintenance doesn't depend on referring everything to the previous owner?

7 points
JA
JackBarnes0602
Replying to BenChen1153

Yes. Ask who supports this configuration, what access transfers, and what service documentation comes with it. Get the scope stated rather than assuming support follows the hardware.

23 points
HA
HazelArcher0397
Replying to JackBarnes0602

Keep the replacement list in its proper role: it describes work performed. It doesn't establish that every other possible condition issue was investigated and excluded.

15 points
BE
BenChen1153
Replying to HazelArcher0397

The itemised bundle does exclude a cable we'd need. At least I can price that now. The headline saving looked nicer without it

9 points
BE
BenChen1153
Replying to BenChen1153

I still don't have enough to judge the condition or complete package. I'm not committing to collection on the strength of 'inspected'

10 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.