Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,710 discussions

N

A small steel assemblies factory: The fixture holds nominal shape. What happens after release?

NinaCarter1023 · 18 points · Applications & integration · 26 Aug 2026
0replies
J

How do I untangle who sets and clears each signal? (inspection-cycle coordination)

JuliaBennett0761 · 25 points · Applications & integration · 26 Aug 2026
8replies
N

Before we add restraint to a fixture we don't fully understand (planning repeatable welding of bracket assemblies)

NoahBell0629 · 30 points · Applications & integration · 26 Aug 2026
4replies
C

What should an offline review show for reviewing torch access for fabricated brackets? (Fairino FR5)

CalebChen1189 · 10 points · Applications & integration · 26 Aug 2026
2replies
R

Before I accept a layout with a simplified torch model (Fairino FR5)

RobinAdams0164 · 9 points · Applications & integration · 26 Aug 2026
2replies
D

The layer pattern fits, but some cartons sit over gaps (Fairino FR10)

DineshAbbott0038 · 31 points · Applications & integration · 26 Aug 2026
10replies
G

The fixture holds nominal shape. What happens after release? (reviewing fixtures for welded mounting brackets)

GraceBrown0929 · 19 points · Applications & integration · 26 Aug 2026
20replies
H

Keeping failed checks in history without counting every retry - per-item inspection

HarishArcher0402 · 36 points · Applications & integration · 26 Aug 2026
11replies
J

Universal Robots UR5e panel tooling: the bench seal is only part of my question - planning single-panel vacuum transfers

JuliaChen1196 · 37 points · Applications & integration · 26 Aug 2026
21replies
Z

Our 75 starting batch doesn't answer the maintenance question

ZaraBrooks0830 · 35 points · Applications & integration · 25 Aug 2026
6replies
H

A small finished-goods dispatch area: Is alternating the layers actually right for our cartons?

HassanBell0617 · 20 points · Applications & integration · 25 Aug 2026
15replies
H

A carton palletising project: Can this alternating pattern support the load it arranges?

HassanBrooks0791 · 3 points · Applications & integration · 25 Aug 2026
0replies
J

Fairino FR5: Reconciling retained job state without resending work

JaneAbbott0075 · 29 points · Applications & integration · 25 Aug 2026
13replies
I

A robotic welding cell planning area: Our welding layout draws the torch as a line

ImranChen1175 · 26 points · Applications & integration · 25 Aug 2026
13replies
G

Can this alternating pattern support the load it arranges? (Fairino FR5, arranging shipping cartons in pallet layers)

GraceChen1190 · 37 points · Applications & integration · 25 Aug 2026
2replies
J

The CAD fit looks fine. Our samples disagree. (Fairino FR10, loading brackets into a locating nest)

JoAli0244 · 8 points · Applications & integration · 25 Aug 2026
5replies
C

How do I connect fixture location with released dimensions?

ChenBaker0442 · 11 points · Applications & integration · 25 Aug 2026
18replies
D

Fairino FR5: How should I review support and separation for thin panels?

DineshBell0647 · 36 points · Applications & integration · 25 Aug 2026
9replies
V

What should packaging approve for stacking a labeled dispatch carton? - palletising sealed product cartons

VictorAbbott0011 · 33 points · Applications & integration · 25 Aug 2026
2replies
M

Which job owns the completion after reconnect? - fixture-check bookkeeping

MinaAbbott0076 · 11 points · Applications & integration · 25 Aug 2026
16replies