Applications & integration

Machine tending, welding, palletising, and end-of-arm tooling.

Start a discussion
Started in

3,716discussions

L

Which geometry is missing from this welding-cell proposal?

LucaBennett0700 · 6 points · Applications & integration · 27 May 2026
10replies
L

Lightweight component sorting bench: What should I ask after an unconfirmed gripper-kit substitution?

LouisBrown0920 · 4 points · Applications & integration · 27 May 2026
8replies
S

What should an offline review show for reviewing torch access for fabricated brackets? (Fairino FR10)

SofiaAli0195 · 30 points · Applications & integration · 27 May 2026
9replies
M

How do I assess a tidy pattern with questionable support? (Universal Robots UR5e)

MeiChan1125 · 14 points · Applications & integration · 27 May 2026
11replies
M

What should count as dimensional acceptance after welding?

MayaBarnes0562 · 16 points · Applications & integration · 27 May 2026
0replies
S

Fairino FR10: The fixture holds nominal shape. What happens after release?

SaraBrooks0809 · 36 points · Applications & integration · 27 May 2026
21replies
J

The layer pattern fits, but some cartons sit over gaps (planning alternating carton layers on a pallet)

JaneAdams0162 · 35 points · Applications & integration · 27 May 2026
1replies
K

Before I sign off a pallet drawing full of neat rectangles

KaiArcher0367 · 31 points · Applications & integration · 26 May 2026
3replies
E

Universal Robots UR5e: What should packaging approve for stacking a labelled dispatch carton?

EmmaBaker0463 · 30 points · Applications & integration · 26 May 2026
0replies
S

A robot-loaded inspection station: Checking the nest before agreeing to more clamp force

SarahBennett0763 · 15 points · Applications & integration · 26 May 2026
0replies
R

a gusseted angle-bracket assembly moves after release in our old inspection notes (Fairino FR5)

RaviAbbott0041 · 0 points · Applications & integration · 26 May 2026
12replies
T

Fairino FR5: A high completion signal isn't necessarily new work

TobyBrooks0840 · 37 points · Applications & integration · 26 May 2026
1replies
I

Which old measurements can actually guide our fixture review? (reviewing fixtures for welded mounting brackets)

IsaacCarter1042 · 8 points · Applications & integration · 26 May 2026
21replies
M

The fixture holds nominal shape. What happens after release? (Fairino FR5)

MayaAbbott0040 · 10 points · Applications & integration · 26 May 2026
12replies
H

The fixture holds nominal shape. What happens after release? - preparing robotic welding of gusseted brackets

HenryBrooks0786 · 28 points · Applications & integration · 26 May 2026
9replies
Z

Fairino FR5: Our carton has a preferred support direction. The pattern rotates it.

ZaraBrown0917 · 8 points · Applications & integration · 26 May 2026
15replies
J

Can a sealing result support this panel-transfer decision? (transferring thin panels from a stack into a nest)

JaneCarter1032 · 32 points · Applications & integration · 26 May 2026
8replies
M

Can this alternating pattern support the load it arranges? (Fairino FR5)

MeiBell0690 · 28 points · Applications & integration · 26 May 2026
5replies
D

Our monitor counts a retained PLC signal twice - part acceptance reporting

DavidBrown0954 · 18 points · Applications & integration · 26 May 2026
2replies
K

Fairino FR10: Is alternating the layers actually right for our cartons?

KaiArcher0367 · 33 points · Applications & integration · 25 May 2026
1replies