Programming & support

Work through software, SDKs, connectivity, and commissioning.

Start a discussion
Started in

2,346discussions

F

When should a tray job count a transfer as complete? - fixture-to-tray transfer

FarahChen1200 · 5 points · Programming & support · 12 Aug 2026
11replies
A

A robot-presented camera station: A fixed camera, small presentation changes, very different streaks

AlexBrooks0820 · 24 points · Programming & support · 12 Aug 2026
0replies
A

How do I trace one inspection attempt across systems? (Fairino FR10)

AnilChan1071 · 17 points · Programming & support · 11 Aug 2026
0replies
J

Our normal tray loop works until something stops it - fixture-to-tray transfer

JasperBennett0725 · 33 points · Programming & support · 11 Aug 2026
1replies
B

Request received isn't the same as area available, is it? (Fairino FR5, planning a lathe load-and-unload sequence)

BrunoCarter0974 · 11 points · Programming & support · 11 Aug 2026
6replies
R

Our tray index stops matching reality after a restart (fixture-to-tray transfer)

RobinAdams0164 · 13 points · Programming & support · 11 Aug 2026
2replies
S

My fixture-check completion reporting tracker mixes up consecutive attempts

SamAbbott0072 · 25 points · Programming & support · 11 Aug 2026
2replies
D

Matching Python and PLC events for Fairino FR10 (fixture inspection)

DineshBarnes0560 · 32 points · Programming & support · 11 Aug 2026
0replies
F

More diagnostics, less updating (read-only diagnostic sampling)

FelixBarnes0545 · 37 points · Programming & support · 11 Aug 2026
16replies
N

Our saved handling job needs a better handover - fixture-to-tray unloading

NadiaBrooks0813 · 28 points · Programming & support · 11 Aug 2026
13replies
O

Fairino FR5: I think our instructions are the problem, not operator attitude

OmarBell0665 · 10 points · Programming & support · 11 Aug 2026
15replies
L

A planned enclosed machining cell: planning a lathe load-and-unload sequence: one status, conflicting definitions

LouisBennett0746 · 19 points · Programming & support · 11 Aug 2026
13replies
E

Pending doesn't tell me whether the robot accepted the job (Universal Robots UR5e, inspection-cycle execution)

ElenaBarnes0601 · 12 points · Programming & support · 10 Aug 2026
14replies
O

How do I build a trustworthy reference set for a brushed stainless trim plate? (Universal Robots UR5e)

OwenBennett0747 · 11 points · Programming & support · 10 Aug 2026
7replies
J

Fairino FR10 inspection plan: scratches or changing reflections? (checking cosmetic metal surfaces with a fixed camera)

JasperChan1073 · 19 points · Programming & support · 10 Aug 2026
7replies
J

Tracking a polymer sleeve through an interrupted transfer (Fairino FR5, indexed tray loading)

JuliaAli0239 · 26 points · Programming & support · 10 Aug 2026
2replies
R

Fairino FR5: A fixed camera, small presentation changes, very different streaks

RaviBennett0737 · 26 points · Programming & support · 10 Aug 2026
0replies
F

What counts as a confirmed defect on a reflective surface? (Universal Robots UR5e)

FarahAli0243 · 6 points · Programming & support · 10 Aug 2026
6replies
A

A shared parts handling bench: Pick, place, advance: the interruption is where we get lost

AmaraAbbott0078 · 29 points · Programming & support · 10 Aug 2026
3replies
V

The screen looks fine even when the request fails - read-only mode reporting

VictorChan1055 · 20 points · Programming & support · 10 Aug 2026
1replies