Workshop owner evaluating a first automation purchase

FelixAli0197

Felix Ali

FA
NetherlandsJoined 10 Dec 2024142 posts

About

Workshop owner evaluating a first automation purchase. Currently exploring small-batch automation and robot comparisons. Working around mixed supplier documentation; planning a 4-week trial before making a decision.

Small-batch automationRobot comparisons

Conversations

B

Different exposed lengths before we even involve Fairino FR5 (preparing a lathe blank-loading sequence)

BenChen1153 · 22 points · Applications & integration · 1 Sept 2026
10replies
C

Testing status parsing without the workshop cell (Fairino FR5, sample status display)

ChenChen1138 · 13 points · Programming & support · 27 Aug 2026
2replies
A

my FR5 spacer-loading ticket still has only the phone version of the stop

AmaraBell0687 · 24 points · Buying robots from China · 23 Aug 2026
15replies
F

Our inspection dashboard is nearly finished with a batch that is not

FelixAli0197 · 39 points · Applications & integration · 16 Aug 2026
17replies
N

Our Fairino FR5 event list doesn't line up with the application log - part acceptance recording

NadiaBell0639 · 2 points · Programming & support · 3 Aug 2026
14replies
J

Another faceplate image meeting, and the streak labels are ahead of the evidence

JamieAli0208 · 7 points · Programming & support · 31 Jul 2026
20replies
R

Fifty-five days waiting for the extra UR5e adapter, not the fitted one

ReeceBrooks0819 · 3 points · Buying advice · 29 Jul 2026
18replies
L

Before I sign off a pallet drawing full of neat rectangles (Fairino FR10)

LucyBennett0741 · 29 points · Applications & integration · 21 Jul 2026
18replies
O

What does 'inspected' mean on this refurbished Fairino FR5? - fixture-to-tray transfer

OmarCarter1013 · 12 points · Buying advice · 21 Jul 2026
19replies
D

Our status wrapper reads too much into a container (Universal Robots UR5e)

DavidCarter1041 · 37 points · Programming & support · 19 Jul 2026
11replies
J

Fairino FR10: Before I sign off a pallet drawing full of neat rectangles

JaneBrown0945 · 9 points · Applications & integration · 18 Jul 2026
4replies
N

Must I reject our UR5e substitute pads, or can we assess them without starting again?

NoahChan1064 · 13 points · Applications & integration · 5 Jul 2026
19replies
R

How do I stop defending our FR5 pouch trial because I built it?

RosaBell0640 · 35 points · Applications & integration · 30 Jun 2026
1replies
C

Why does reconnect give our FR10 coupon another completion?

CallumBennett0708 · 35 points · Applications & integration · 28 Jun 2026
18replies
F

FR5 suffix and adapter interface differ from our confirmed configuration

FelixAli0197 · 32 points · Buying advice · 22 Jun 2026
4replies
A

Which part of our FR10 logging path is delaying the trend screen?

AmyChen1163 · 9 points · Programming & support · 17 Jun 2026
6replies
F

Two meanings of ready in our CNC handover meeting

FelixAli0197 · 35 points · Programming & support · 15 Jun 2026
0replies
T

How many more guides does this FR5 refill trial deserve?

TobyBaker0492 · 8 points · Applications & integration · 10 Jun 2026
18replies
L

What do I put in the handover when our spare filter still hasn't arrived?

LuisAli0260 · 34 points · Buying advice · 8 Jun 2026
3replies
T

The first read after reconnect fools our application (sample verification tracking)

TheoAdams0149 · 20 points · Applications & integration · 24 May 2026
10replies