Packaging changeover operator

LiamArcher0403

Liam Archer

LA
South East EnglandJoined 19 Mar 2025182 posts

About

Packaging changeover operator. Currently exploring fairino robots and buying robots from china. Working around tight tooling clearance; planning a 14-week trial before making a decision.

Fairino robotsBuying robots from China

Conversations

L

How much work have I left out of handling a machined spacer? (Fairino FR5)

LucyBaker0480 · 9 points · Buying advice · 30 Aug 2026
12replies
E

Will a thin coated steel panel stay supported and arrive as a single item? (Universal Robots UR5e)

EllaAdams0120 · 26 points · Applications & integration · 29 Aug 2026
21replies
S

A bench handling station: Intermittent stops while handling a molded connector body: what should I capture?

SamBell0681 · 23 points · Buying robots from China · 9 Aug 2026
8replies
L

A robot-presented camera station: What counts as a confirmed defect on a reflective surface?

LinAllen0270 · 14 points · Programming & support · 3 Aug 2026
18replies
N

Our Fairino FR5 event list doesn't line up with the application log - part acceptance recording

NadiaBell0639 · 2 points · Programming & support · 3 Aug 2026
14replies
L

Our status wrapper reads too much into a container (diagnostic status retrieval)

LucyBell0654 · 34 points · Programming & support · 16 Jul 2026
14replies
O

Our example images keep turning shiny patches into defects

OscarAbbott0010 · 25 points · Programming & support · 11 Jul 2026
10replies
L

ur5e inspection monitor freezes while its detailed log grows

LiamArcher0403 · 13 points · Programming & support · 7 Jul 2026
8replies
L

Cannot rank our UR5e housing-tool offers from a bare-part weight

LeahChan1104 · 11 points · Buying advice · 14 Jun 2026
9replies
N

Our cover's scratch changes position when the cover is reseated

NathanBennett0721 · 19 points · Programming & support · 10 Jun 2026
10replies
A

Can this alternating pattern support the load it arranges? (Fairino FR10)

AmyBrooks0815 · 12 points · Applications & integration · 2 Jun 2026
20replies
L

Long fingers, an adapter, and a quote based on part mass (Fairino FR5, loading metal housings into inspection nests)

LiamArcher0403 · 6 points · Buying advice · 31 May 2026
7replies
P

Fairino FR10: Are we teaching our camera to reject reflections?

PriyaAdams0133 · 18 points · Programming & support · 29 May 2026
1replies
L

Which drawings would connect carton support with gripper access? - arranging shipping cartons in pallet layers

LuisCarter1043 · 27 points · Applications & integration · 29 May 2026
11replies
L

Small tray handling station: Seller promised an extra tool cable, not just the installed one

LiamArcher0403 · 12 points · Buying advice · 27 May 2026
16replies
L

Enough reach, incomplete drawing - machine fixture loading

LiamArcher0403 · 24 points · Fairino robots · 22 May 2026
1replies
C

Universal Robots UR5e: The installed pendant cable is here; the spare isn't

ClaraBaker0437 · 20 points · Buying advice · 15 May 2026
21replies
E

The reach sketch leaves out our machine door and gripper - machine fixture loading

EmmaArcher0376 · 12 points · Fairino robots · 15 May 2026
14replies
J

How representative is one good vacuum sample? (transferring closed cartons between packing stations)

JamieBarnes0556 · 17 points · Applications & integration · 7 May 2026
11replies
F

Fairino FR10: Does this delivery note account for the whole package?

FarahArcher0417 · 36 points · Buying advice · 4 May 2026
17replies