Workshop owner evaluating a first automation purchase

MiaBarnes0557

Mia Barnes

MB
GermanyJoined 19 Apr 202671 posts

About

Workshop owner evaluating a first automation purchase. Currently exploring vision inspection and workshop projects. Working around a restricted weekend trial window; planning a 4-week trial before making a decision.

Vision inspectionWorkshop projects

Conversations

M

planning camera inspection of reflective parts: what should we establish before tuning thresholds?

MiaBarnes0557 · 8 points · Programming & support · 3 Sept 2026
2replies
M

What counts as a confirmed defect on a reflective surface? - presenting reflective components for surface inspection

MiaBarnes0557 · 32 points · Programming & support · 1 Sept 2026
0replies
M

The FR10 trim-plate captions are more certain than the pictures

MiaBarnes0557 · 19 points · Programming & support · 22 Aug 2026
2replies
M

Our Fairino FR10 tooling plan is stuck at the bench-fit stage (planning repeatable bracket location)

MiaBarnes0557 · 13 points · Applications & integration · 5 Aug 2026
11replies
M

Another reflective part, the same premature scratch labels

MiaBarnes0557 · 24 points · Programming & support · 1 Aug 2026
3replies
M

Detailed FR10 logs are busy while our display sits on an old reading

MiaBarnes0557 · 31 points · Programming & support · 30 Jul 2026
5replies
M

A tiny bezel movement relocates our alleged scratch

MiaBarnes0557 · 17 points · Programming & support · 25 Jul 2026
2replies
M

Our fixture plans and the delivered arm don't line up (Fairino FR10, positioning inspection samples)

MiaBarnes0557 · 11 points · Buying advice · 20 Jul 2026
2replies
M

Fairino FR10: Bright streaks move when we present the part differently

MiaBarnes0557 · 32 points · Programming & support · 17 Jul 2026
6replies
M

Our trim-plate scratch arrows are more certain than our FR10 inspection plan

MiaBarnes0557 · 24 points · Programming & support · 3 Jul 2026
20replies
H

FR5 trim reference folder follows the bright stripe instead of the surface

HugoCampbell · 23 points · Programming & support · 24 Jun 2026
11replies
M

Our FR10 handover shows the main routine and hides everything it calls

MiaBarnes0557 · 29 points · General robotics · 23 Jun 2026
21replies
M

Old FR10 coupon completion jumps into the new attempt in our test

MiaBarnes0557 · 19 points · Programming & support · 23 Jun 2026
17replies
M

Our FR5 arrived, its extra pendant cable is always next shipment

MiaBarnes0557 · 17 points · Buying advice · 21 Jun 2026
13replies
M

What counts as a confirmed defect on a reflective surface? (Universal Robots UR5e)

MiaBarnes0557 · 3 points · Programming & support · 7 Jun 2026
13replies
M

Reviewing a missed request without confusing it with rejection (part inspection)

MiaBarnes0557 · 9 points · Applications & integration · 2 Jun 2026
1replies
B

A cosmetic components workshop: A fixed camera, small presentation changes, very different streaks

BethBell0672 · 25 points · Programming & support · 1 Jun 2026
15replies
M

Bright streaks move when we present the part differently - checking cosmetic metal surfaces with a fixed camera

MiaBarnes0557 · 23 points · Programming & support · 28 May 2026
8replies
M

Fairino FR10 pallet plan: support and tool access need the same review

MiaBarnes0557 · 12 points · Applications & integration · 22 May 2026
10replies
M

Now the FR10 trim-plate examples have the same wandering 'scratch'

MiaBarnes0557 · 21 points · Programming & support · 9 May 2026
0replies