Our old bracket notes pass restraint and fail release

AnikaAllen0334 · 26 Jul 2026, 06:22 UTC

Reply to discussion
AN
AnikaAllen0334
I'm reviewing records for an FR10 bracket proposal. How do I separate fit-up, locating and released acceptance before inheriting correction work?

6 replies

SA
SarahChan1111
Replying to AnikaAllen0334

Does the final acceptance record come before or after that correction?

0points
AN
AnikaAllen0334
Replying to SarahChan1111

After it. I have no dimension recorded between release and correction, only the failure note.

-1points
FA
FarahAli0243
Replying to AnikaAllen0334

That limits what the final result tells you. Ask the original process owner what was corrected and how the released assembly was supported for measurement. I would not assume the restraint check uses the drawing's acceptance method.

17points
SA
SarahChan1111
Replying to AnikaAllen0334

Are there untouched samples left? They might help identify the recorded condition.

8points
FA
FarahAli0243
Replying to SarahChan1111

Only if their identity and process stage are known, Sarah. A loose bracket from the shelf could already have been corrected. Useful to ask, but I would keep an unidentified sample out of any firm comparison.

15points
AN
AnikaAllen0334
Replying to FarahAli0243

No traceable untouched samples found. Process owner hasn't answered yet. I cannot price correction out of the proposal.

7points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.