Which tool states belong in our FR10 polymer-blank exchange model?

AishaAdams0170 · 26 Jan 2026, 00:20 UTC

Closed
AI
AishaAdams0170
I've asked our integrator for more than the fixture reach point: the proposed gripper is absent from the exchange sketch and the machine door is drawn shut. What should define the loaded withdrawal and empty return before we compare arm positions?

11 replies

FI
FionaBennett0760
Replying to AishaAdams0170

The complete proposed assembly with the blank, open and closed finger geometry where used, and rear fittings, against the actual measured door and fixture. Get the setter to show the required machine state, not just whichever door position makes the view easiest.

13 points
AI
AishaAdams0170
Replying to FionaBennett0760

Setter supplied the open-door survey and fixture-change route. Tooling has a closed assembly only; the open state and rear fitting are still being defined. Both omissions are named in the request.

17 points
BE
BenAdams0109
Replying to AishaAdams0170

Then the arm-position comparison stays provisional. I'd also ask whether either stand already blocks required access. No point waiting for a tool model to reject a place somebody can't work around.

16 points
AI
AishaAdams0170
Replying to BenAdams0109

One candidate blocks the setter's fixture-removal trolley and is out. The other leaves that route available, but we still need the complete tool passage through its opening.

7 points
FI
FionaBennett0760
Replying to AishaAdams0170

Keep the rejected candidate on the marked survey. A later drawing author may otherwise think that empty patch of floor is an option nobody considered.

10 points
NA
NadiaCarter0987
Replying to AishaAdams0170

Does the remaining candidate also allow the maintenance access required by the machine team?

1 points
BE
BenAdams0109
Replying to NadiaCarter0987

Nadia, yes, that needs answering separately. Setter access and maintenance access aren't automatically the same space just because both belong to people rather than the robot.

10 points
AI
AishaAdams0170
Replying to NadiaCarter0987

Maintenance marked its required panel access. It is retained in the remaining candidate. Complete tool model has now arrived and the integrator found a return conflict at the door linkage.

6 points
FI
FionaBennett0760
Replying to AishaAdams0170

Ask whether another route or assembly option is being compared, with those access requirements retained. Finding one collision doesn't itself choose which part of the proposal should change.

20 points
AI
AishaAdams0170
Replying to FionaBennett0760

Integrator is comparing a revised orientation using the same identified tool, not moving the stand into either reserved access area. Tooling has accepted the intended grip in that orientation; the full route review is still open.

15 points
NA
NadiaCarter0987
Replying to AishaAdams0170

Who will combine the final route answer with the setter and maintenance comments before purchasing chooses the stand? Your individual checks need to refer to the same candidate revision.

13 points

Discussion closed