We're planning planning repeatable welding of bracket assemblies with Fairino FR5 on a steel gusseted bracket assembly in a robotic welding project review.
Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release.
I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment
Each concept should reference the required released inspection condition. Without that link, a proposal may again establish restrained geometry while leaving final acceptance unanswered.