Which bracket measurement was taken after release?

RobinAli0251 · 21 Mar 2025, 01:58 UTC

Closed
RO
RobinAli0251
Reviewing old inspection sheets for an FR5 bracket-welding proposal. Two columns say height, one measured in the jig and one at the bench. The numbers differ, but the bench setup is not described. Someone wants to copy the jig's correction shim. What can we establish from these records before buying tooling?

9 replies

HA
HassanArcher0356
Replying to RobinAli0251

Establish the measurement datum and restraint condition for each column; the shared word height does not make the values comparable.

16points
RO
RobinAli0251
Replying to HassanArcher0356

The jig column measures from its baseplate. The bench column appears to use the underside of the finished bracket. No instruction for how it was supported.

5points
HA
HassanArcher0356
Replying to RobinAli0251

Mark the bench condition unknown until you find supporting evidence; subtracting the two columns will not isolate release distortion.

13points
SA
SamBrooks0855
Replying to RobinAli0251

Are any of the measured brackets still available with their inspection numbers? Comparing one identified part using an agreed setup might be cheaper than trying to reconstruct every old entry.

7points
HA
HassanArcher0356
Replying to SamBrooks0855

Useful for establishing present measurements, though it cannot prove how the historical bench value was obtained.

8points
RO
RobinAli0251
Replying to SamBrooks0855

Found two retained brackets with matching numbers. Quality will measure them against the drawing. The old jig has also been altered since those sheets, so its current shim stack is not evidence of the old setup.

22points
HA
HassanArcher0356
Replying to RobinAli0251

Keep the current jig revision separate in the review; otherwise you will accidentally explain old measurements with newer hardware.

17points
RO
RobinAli0251
Replying to HassanArcher0356

Quality confirmed one retained part is outside the finished height requirement. The records cannot tell us when it departed from nominal. We have excluded the undocumented shim stack from the new fixture specification.

8points
HA
HassanArcher0356
Replying to RobinAli0251

Specify the missing measurements for the pilot: incoming fit-up, located condition and released acceptance, with traceable part identities and defined setups.

13points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .