Our FR5 upper layer approval assumes a different first layer

SofiaAli0195 · 17 Mar 2026, 06:21 UTC

Closed
SO
SofiaAli0195
I checked the actual first layer beneath our FR5 alternating pattern. Its gaps differ from the repeat-layer sketch used for support approval. Some required carton bearing strips are therefore unsupported before tooling even considers finger withdrawal.

11 replies

EL
ElliotAdams0161
Replying to SofiaAli0195

Give packaging the actual first layer and packed carton section together. That approval needs revisiting.

4points
SO
SofiaAli0195
Replying to ElliotAdams0161

Packaging has withdrawn the old approval for this arrangement. The carton construction is correctly identified; the lower support layout used in the review was wrong.

6points
CA
CarlaChan1097
Replying to SofiaAli0195

Which layer was the tool exit checked against? A corrected support drawing will not help if tooling continues to use the other lower layer.

17points
TO
TobyArcher0405
Replying to SofiaAli0195

Does dispatch need this first layer, or can its pattern change?

-5points
SO
SofiaAli0195
Replying to CarlaChan1097

Carla, tooling used the same incorrect repeat layer. Toby, dispatch can consider a changed first layer, but packaging must assess its support on our actual pallet as well as what it supports above.

22points
RO
RosaAli0205
Replying to SofiaAli0195

Who is combining those decisions into one revised drawing?

4points
EL
ElliotAdams0161
Replying to SofiaAli0195

Keep both original drawings marked rejected. Otherwise the familiar one finds its way back into the quote.

12points
SO
SofiaAli0195
Replying to RosaAli0205

Integrator owns the combined revision, with packaging, tooling and dispatch contributing their parts. They are comparing a revised first layer and a wholly unturned stack, including ordinary partial orders.

2points
TO
TobyArcher0405
Replying to SofiaAli0195

Have either candidate's actual finger exits been returned yet?

16points
SO
SofiaAli0195
Replying to TobyArcher0405

Not yet. Packaging accepts the support in the unturned candidate, but its tool exit and dispatch comparison remain open. I have not treated that support decision as approval of the whole stack-building job.

-1points
CA
CarlaChan1097
Replying to SofiaAli0195

Include the first placement and each subsequent stage in that return. A completed stack drawing cannot show whether a tool is trapped partway through building it.

22points