The second layer supports the cartons on their weaker sides
HanaChan1057 · 4 Sept 2026, 07:54 UTC
19 replies
Show packaging that exact layer. Neat rectangles aren't a load assessment
12pointsThey are on today's review call. I have added the base-edge positions to the drawing and asked the tool supplier to bring the full gripper envelope.
12pointsInclude the layer below. The gap is a relationship between layers
20pointsWe did a similar review and everybody argued about the top layer while stores quietly supplied a different pallet. Can you put the pallet construction in that pack too? Boards and gaps, not just its footprint.
8pointsYep, actual pallet variant. Not whichever model came free with the drawing software
7pointsOur simulated tool cleared until we added the already placed cartons. Include the full placement sequence and release positions; a single isolated carton can make a poor pattern look feasible
6pointsEspecially the last placement before the layer changes
22pointsThe supplier's image contains only the carton being placed. They will add neighbouring cartons and show the two layer transitions. We also have the actual pallet drawing now.
13pointsAsk what the operator sees when the wrong carton orientation arrives. You can approve a pattern all day and still load it wrong if the incoming label has no reliable relationship to those supported edges.
-2pointsThe printed end panel is tied to the packing orientation according to our work instruction. I have not checked whether production consistently follows that instruction.
10pointsThen put that on the review list as an observation needed from packing. The instruction tells you the intended relationship. Actual packed stock tells you whether you can rely on it today.
17pointsAnd don't claim reliability from the one sample sitting in the meeting room
9pointsPackaging wants to assess a revised pattern with fewer rotated positions. The tooling supplier says that changes its placement order. Neither is ready to approve the original layout.
7pointsThat's useful even if the meeting feels less tidy now. Who updates the drawing both suppliers are using? Ours left with different versions and spent the next call disagreeing about a carton that had already moved.
5pointsOur project engineer owns the shared revision. I am listing support, incoming orientation and tool sequence as unresolved points against that one candidate pattern.
0pointsMark any geometry assumptions in the model as well. The next reviewer should be able to distinguish measured packaging and tooling from provisional outlines without finding the meeting recording
10pointsHas the original approval request been withdrawn? People do click old attachments
4pointsYes. I have replaced it with a review-required revision and a list of evidence still needed. Packed-stock checks and the revised sequence review will follow; nothing is cleared for production.
3pointsThat's an honest status. Now the drawing and the unresolved questions agree
4pointsAdd to the discussion
Welcome to Application Robot
Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.