Get the full tool assembly and measured machine opening into one model first. Include the connected lines and the tool's required states. Then compare the whole route; reaching the blank's centre is the easiest bit of this drawing.
Cannot choose our FR10 position from a blank-only mill sketch
OwenBaker0486 · 2 Mar 2026, 16:22 UTC
21 replies
Closed tool assembly has arrived and overlaps the open door on the proposed withdrawal; open fingers and the rear connection arrangement are still missing from the model
5 pointsIs that stand position fixed, or just proposed?
7 pointsAnd have the setter's changeover tasks been surveyed? A new stand position has to preserve access to the fixture and the route for removing it, not only leave a person-sized gap.
12 pointsI would compare a second defined position if the bay permits it. Before anyone spends a week finding a clever tool for the first dot on the floor, ask which space is actually available.
7 pointsPosition is only proposed, Priya; the survey includes fixture removal on its handling aid, Chloe, and the workshop lead permits comparison of one side position, Jonas, but not moving the changeover area
7 pointsThat gives the integrator two real cases. Keep the same actual blank and required grip in both, or a nicer route may quietly depend on holding it differently without an assessment.
19 pointsAnil, agreed, though a changed tool could be a legitimate third option if someone defines it. I meant avoid treating the first position as compulsory, not ban other arrangements.
3 pointsTool supplier has also proposed a shorter adapter for the original position; I have asked for its complete assembly and held-blank geometry, with the side-position comparison continuing separately
18 pointsHas anyone ordered the stand already?
9 pointsThe shorter adapter needs the complete handling assessment as well as clearance. Don't let reducing the sketch's overlap become the entire specification for a replacement tool.
23 pointsNo stand ordered, Priya; the missing open-state and rear-connection geometry is now supplied for both adapter arrangements, and the integrator has the measured door and handling-aid route in the combined comparison
8 pointsNow the comparison can answer something. Which arrangement clears withdrawal and return, Owen, and which of those preserves the actual changeover route?
8 pointsChloe's assessment point still matters if the shorter assembly clears. It may change the grip position relative to the wrist or the route between the mill and destination; neither should be assumed unchanged.
0 pointsSide position clears the machine but blocks fixture removal; shorter-adapter version at the original position still clashes on the open-tool return, so neither currently gives us an acceptable layout
5 pointsThen why keep that bay in the purchase plan?
15 pointsFair question. There may be another defined option, but Owen has already said the changeover area stays. Don't make the setter surrender it just because the first two drawings were expensive to obtain.
1 pointsHas the workshop lead accepted that result, Owen? The buying summary should carry both failed cases and the actual access reasons, not just say further layout work required.
15 pointsLead accepted it and we have stopped this FR10 purchase for the present bay; both route failures and the retained changeover requirement are in the decision, with no alternative location authorised for study
7 pointsThat is enough to stop spending on this layout. A different location, if one becomes available later, can be a new comparison rather than an undocumented promise hidden in this one.
21 pointsDiscussion closed