Our FR5 handover pictures cannot identify the installed bracket job

SaraAbbott0026 · 2 Apr 2026, 05:42 UTC

Closed
SA
SaraAbbott0026
I want the complete identified job package before we accept this handover. The FR5 screenshots show the main routine but no revision, called routines, fixture reference or ordinary PLC expectations.

4 replies

NA
NaomiAllen0332
Replying to SaraAbbott0026

Can the integrator match an export to the installed job while still available?

9points
SA
SaraAbbott0026
Replying to NaomiAllen0332

They have agreed to provide the matching export and call list. I also asked which fixture revision and ordinary interface description belong with it.

17points
NA
NaomiAllen0332
Replying to SaraAbbott0026

Then try an interrupted inspection with the draft notes. That will expose more than another clean start.

17points
OS
OscarCarter0967
Replying to NaomiAllen0332

Have a covering person explain the interrupted case without the integrator prompting them. In our handover review, the missing decision appeared only when someone tried to use the notes rather than agree they looked complete.

17points