Our FR5 handover pictures cannot identify the installed bracket job

SaraAbbott0026 · 2 Apr 2026, 05:42 UTC

Reply to discussion
SA
SaraAbbott0026
I want the complete identified job package before we accept this handover. The FR5 screenshots show the main routine but no revision, called routines, fixture reference or ordinary PLC expectations.

4 replies

NA
NaomiAllen0332
Replying to SaraAbbott0026

Can the integrator match an export to the installed job while still available?

9 points
SA
SaraAbbott0026
Replying to NaomiAllen0332

They have agreed to provide the matching export and call list. I also asked which fixture revision and ordinary interface description belong with it.

17 points
NA
NaomiAllen0332
Replying to SaraAbbott0026

Then try an interrupted inspection with the draft notes. That will expose more than another clean start.

17 points
OS
OscarCarter0967
Replying to NaomiAllen0332

Have a covering person explain the interrupted case without the integrator prompting them. In our handover review, the missing decision appeared only when someone tried to use the notes rather than agree they looked complete.

17 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.