Separate FR10 bracket quote this time. Supplier includes an in-fixture check, but our old final acceptance followed correction. Which inspection step should I ask them to price?
I'd ask for the correction decision too, not just the final measuring time. We have a habit of pricing the tidy inspection bench and forgetting the person who sorts which parts go to the less tidy one.
I've watched that expectation turn into an operator with a hammer beside a supposedly finished cell. Ask for a trial result before removing the work. And don't let the old correction method become the new default without review either.
I've requested Q8 inspection pricing and a current-part trial before accepting the no-correction assumption. Fabrication's selection check still outstanding.