Who should assess our FR5 tool-interface damage before power-up?

FarahBell0678 · 4 Dec 2025, 23:39 UTC

Closed
FA
FarahBell0678
Our FR5 crate support shifted into the tool-interface area. Visible damage, packaging retained, unit unpowered. Seller says switch on. Who should assess the impact first?

2 replies

TH
TheoAli0236
Replying to FarahBell0678

Keep it unpowered and request a qualified assessment of the affected assembly using the receiving photographs and unit identifiers; a successful startup would not establish that the impact left it suitable for use.

10points
FA
FarahBell0678
Replying to TheoAli0236

Assessment requested through an identified technical contact. No scope agreed yet; it remains unpowered.

5points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .