I've put the real bezels beside our proposed FR5 images and found people disagreeing about the inspection area as well as the bright streaks. One reviewer includes the flange hidden in assembly; another judges only the visible face.
I need quality to settle that before the camera supplier tunes anything. Or rather, before we give them a folder pretending it is already settled. How should I keep useful examples without turning every disputed line into a confirmed scratch?
Which drawing or finish requirement defines the inspection area? Begin with that, before asking the camera supplier to interpret your reviewers' different assumptions.
Current drawing distinguishes the face and flange, but our image folder has one generic scratch label. Quality has agreed to judge the retained bezels against the two actual requirements.
We had a lesson where a whole-part reject label made every arrow on the image look like a confirmed defect; linking each annotation to its physical location and reason stopped that spreading into the next comparison.
Mina, face only in the quote. Quality says the flange still needs its own check under a different criterion. We cannot quietly count it as covered by the face image.
Have quality classify the actual features within each required area. A rejected bezel can also carry an ordinary reflection, and a bright accepted face remains useful for assessing false detections.
Yes, Yasmin, the holder orientation is clear. Quality accepted the bright face used as our main scratch example. A second bezel has a confirmed face scratch. The disputed flange mark is still being assessed under its separate requirement.
Corrected sample list sent. Accepted bright face and identified face scratch stay together; flange observation remains labelled undecided. Supplier has been asked to price the missing flange inspection scope separately.
They accepted it under the applicable flange criterion and added the reason to its physical reference. Face-lighting comparison remains due. We now have usable labels, but I haven't received a proposal covering the whole inspection job.