Small-firm purchasing coordinator

OscarBennett0706

Oscar Bennett

OB
CanadaJoined 23 Mar 2025109 posts

About

Small-firm purchasing coordinator. Currently exploring robot comparisons and vision inspection. Working around a small commissioning team; planning a 15-week trial before making a decision.

Robot comparisonsVision inspection

Conversations

R

The layer count works, but the carton support doesn't look right

RaviBrooks0824 · 25 points · Applications & integration · 4 Sept 2026
10replies
S

How do I locate the FR5 controller behind fifty-six days of split-shipment replies?

SarahAbbott0067 · 31 points · Buying advice · 19 Aug 2026
20replies
C

I cannot approve bezel thresholds from these bright-line labels

CarlaBarnes0575 · 11 points · Programming & support · 30 Jul 2026
10replies
L

A shared production room: Starting with 127: what belongs in the pilot budget?

LucaBell0613 · 26 points · Buying advice · 16 Jul 2026
1replies
K

Trying to explain what our locator actually improved - tray-to-fixture transfer

KaiBennett0715 · 18 points · Applications & integration · 15 Jul 2026
13replies
E

Steel bush stick-out sheet with no separate length or seating record

EmmaCarter0985 · 27 points · Applications & integration · 22 Jun 2026
14replies
L

How do I stop our FR10 bezel reference set voting on reflections?

LuisBrown0956 · 13 points · Programming & support · 13 Jun 2026
14replies
O

How do I stop us teaching the FR10 camera that glare is a scratch?

OwenBennett0747 · 36 points · Programming & support · 8 Jun 2026
20replies
Z

What belongs in a useful robot recovery handover? (Universal Robots UR5e)

ZaraBrown0917 · 22 points · Programming & support · 5 Jun 2026
2replies
S

How do I build a trustworthy reference set for a brushed stainless trim plate?

SarahBell0676 · 19 points · Programming & support · 4 Jun 2026
21replies
C

A robot-presented camera station: How do I build a trustworthy reference set for a brushed stainless trim plate?

ChloeBarnes0570 · 4 points · Programming & support · 1 May 2026
15replies
H

What should I report about this incomplete tray-to-tray loading improvement? (Universal Robots UR5e)

HassanChen1139 · 21 points · Applications & integration · 16 Apr 2026
18replies
O

Trying to trace Fairino FR10 through a disputed handover (sorting lightweight components)

OscarBennett0706 · 20 points · Buying robots from China · 16 Apr 2026
10replies
L

Fairino FR10: planning alternating carton layers on a pallet: what should matter besides how many boxes fit?

LucaBarnes0526 · 22 points · Applications & integration · 6 Apr 2026
5replies
N

Which part of our bezel are the FR5 scratch labels judging?

NadiaAbbott0030 · 23 points · Programming & support · 1 Apr 2026
13replies
O

Trim-plate scratch labels without a physical location

OscarBennett0706 · 31 points · Programming & support · 30 Mar 2026
4replies
D

I cannot compare faceplate streaks when the camera keeps changing exposure

DavidArcher0432 · 21 points · Programming & support · 28 Mar 2026
11replies
O

FR10 inspection receipt with two proposed owners

OscarBennett0706 · 12 points · Applications & integration · 26 Mar 2026
18replies
O

Why should our FR5 inspector compensate for the room changing around it?

OscarAdams0097 · 15 points · Programming & support · 21 Mar 2026
10replies
C

How do I make my FR10 reporting test notice it read the wrong field?

CalebCarter1015 · 19 points · Programming & support · 19 Mar 2026
11replies