I imported the old bracket checks for our planned FR10 welding review and initially thought the dimensions jumped at random. The paper sheets have a restrained or released column that never made it into the export.
I'm restoring that field. What other record context should I recover before comparing the results or carrying over the old correction step?
Recover part and drawing identities, fixture revision and the measurement reference as well. I'd also keep the original sheet linked to each entry, because the missing state column may not be the only meaning lost in the export.
The export also merged initial and recheck readings. I've found a correction note between them on one traveller. I'll preserve them as separate observations with that note linked, rather than replacing the first value.
Yes, otherwise a final accepted value can hide how the part got there. Ask the responsible process person to define that correction before treating the recheck outcome as something the new robot sequence will reproduce.