Duplicate inspection count after reconnect

LeoBrooks0797 · 22 Sept 2025, 18:50 UTC

Closed
LE
LeoBrooks0797
We get an extra accepted housing on the UR5e inspection display when the application reconnects. Same retained job number, completion already high. The database still has one result, so I think the screen is adding the reconnect message as another part. Where would you put the check?

6 replies

LE
LeoChen1145
Replying to LeoBrooks0797

At the result entry as well as the screen. Have you actually checked the stored result rows, or just the total shown in another window?

9 points
LE
LeoBrooks0797
Replying to LeoChen1145

Actual rows. One accepted result for that job. Two entries in the display's little event list, one from each connection. The counter is the length of that list

21 points
LU
LucyBrown0915
Replying to LeoBrooks0797

Then stop treating that list as production quantity. It includes connection events dressed up as results. You can show a previously completed job after reconnect without counting another housing.

15 points
LE
LeoChen1145
Replying to LucyBrown0915

Lucy, would you hide the repeat in the event list? I'd leave it visible but say it was loaded again. Handy when somebody says the display jumped.

7 points
LU
LucyBrown0915
Replying to LeoChen1145

Leave the history visible. Give the reconnect entry different wording and build the quantity from accepted result records. And check whether job numbers can repeat after a restart before using the number alone as the key.

17 points
LE
LeoBrooks0797
Replying to LucyBrown0915

Counter now comes from the saved results in our replay test. The repeat entry says restored result. No extra housing counted there. Restart identity still needs answering before we call it fixed.

22 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .