I need signal owners for our training cell. The application misses the PLC request pulse. Who should clear it after acceptance? This is the job interface, separate from safety.
Then ask the authors to draw what acceptance should do before choosing a longer timer; it needs to work when the application is slower than expected too.
I'd sit both down with one missed request. I don't know their intended protocol, but the empty space between their documents is now your support workload. It needs an owner beyond commissioning