Our proposed use for Fairino FR10 is finished blank removal with a cylindrical aluminum blank in a production cell beside an enclosed mill, with 151 planned. The reach sketch suggests the fixture is accessible, but it includes neither the gripper body nor the open machine door. I need a fuller access check to inform our choice of arm.

21 replies

AD
AdaArcher0390
Replying to JuliaChen1196

Got measured outlines for the opening and gripper? An offline layout might catch what the reach circle misses.

9 points
JU
JuliaChen1196
Replying to AdaArcher0390

After comparing the outlines, I found that the proposed approach overlaps the door handle even though the workpiece itself clears. That explains the misleadingly comfortable result in my initial sketch.

13 points
AD
AdaArcher0390
Replying to JuliaChen1196

Start from those measurements and review approach and withdrawal offline with the full tool, cables and maintenance access included. A revised mount then needs the integrator's assessment.

8 points
JU
JuliaChen1196
Replying to AdaArcher0390

@AdaArcher0390 Our buyer says go bigger. Does that help, or just buy the same problem in a larger arm?

16 points
AD
AdaArcher0390
Replying to JuliaChen1196

@JuliaChen1196 Going larger should open up mounting options. It might be the most straightforward option to explore.

16 points
ME
MeiArcher0429
Replying to AdaArcher0390

A different arm geometry may introduce its own clearance problems. Increasing reach doesn't establish that the proposed tool can pass the existing handle obstruction

5 points
AD
AdaArcher0390
Replying to MeiArcher0429

You're right; more mounting freedom isn't guaranteed. Check each candidate in the measured layout and only favour a larger arm if its full approach works better.

8 points
JU
JuliaArcher0413
Replying to AdaArcher0390

@AdaArcher0390 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.

14 points
JU
JuliaChen1196
Replying to JuliaArcher0413

@JuliaArcher0413 Your example prompted me to compare our proposed pedestal with the service panel opening. That revealed another overlap to correct in the layout.

23 points
JO
JoFixtures
Replying to JuliaChen1196

Would making the pedestal removable address service access, or would restoring its position introduce a further setup requirement to evaluate?

20 points
AD
AdaArcher0390
Replying to JoFixtures

A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout.

14 points
JU
JuliaChen1196
Replying to AdaArcher0390

@AdaArcher0390 The fixture requires a straight approach segment. Should we establish that constraint in the model before exploring alternative positions for the robot base?

18 points
AD
AdaArcher0390
Replying to JuliaChen1196

Yes. Include the required entry direction and withdrawal conditions, not just an end pose. A reachable point can still have no usable approach with the proposed tool.

16 points
JU
JuliaArcher0413
Replying to AdaArcher0390

For our machine, withdrawal with a held workpiece needed a different route from entry. The empty-tool model made the clearance look much better than it was.

16 points
JU
JuliaChen1196
Replying to JuliaArcher0413

I'll add both loaded and empty tooling to the model. The other unclear part of our quote is responsibility for the machine signals.

20 points
ME
MeiArcher0429
Replying to JuliaChen1196

@JuliaChen1196 Get the interface responsibility explicit. A robot supplier and machine contact can each assume the other has handled access permission and fixture state

2 points
JO
JoFixtures
Replying to MeiArcher0429

@MeiArcher0429 I'm having trouble distinguishing process readiness from safe entry because the sales description makes them sound equivalent. Does the machine-ready signal establish both?

23 points
AD
AdaArcher0390
Replying to JoFixtures

@JoFixtures Not necessarily. Process readiness doesn't by itself establish safe access. Have the qualified assessor define the cell's protective measures and restart conditions alongside the process interface.

17 points
JU
JuliaChen1196
Replying to AdaArcher0390

@AdaArcher0390 Can we trial representative fixture geometry while the interface scope is still open? I'd like to move the access question along.

13 points
AD
AdaArcher0390
Replying to JuliaChen1196

It can, with an appropriate supervised procedure. Record the actual tool and mount, and make clear that the trial addresses geometry while interface work remains open.

4 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.