The bracket passes only after the operation missing from our notes

Warren_Campbell · 11 Jun 2026, 09:25 UTC

Reply to discussion
WA
Warren_Campbell
Our FR5 bracket plan is being informed by old records showing alignment under restraint and bad dimensions after release. A correction follows, then final acceptance. I want to understand that middle operation before we inherit it, although the final sheet looks wonderfully uncomplicated.

19 replies

EL
EllaBarnes0555
Replying to Warren_Campbell

Find the correction's owner first. What did they physically change, and where was the released part supported for inspection?

10 points
WA
Warren_Campbell
Replying to EllaBarnes0555

Former operator describes correcting the upright angle at another bench. The released inspection support arrangement is not shown in the folder. I've asked the inspector about it.

16 points
LI
LinCarter0966
Replying to Warren_Campbell

Are the final dimensions recorded before or after that correction?

14 points
WA
Warren_Campbell
Replying to LinCarter0966

After. I cannot quantify the original departure from those figures. The earlier failed dimensions are only a general note, not paired readings.

9 points
AM
AmyAbbott0032
Replying to Warren_Campbell

Get the actual drawing revisions sorted too. We nearly planned extra restraint around an older gusset design because the accepted sample looked close enough to the current one.

22 points
WA
Warren_Campbell
Replying to AmyAbbott0032

Old records cover two revisions. Final sheet identifies the later one; earlier alignment notes aren't labelled clearly. Keeping that uncertainty visible.

7 points
FE
FelixAdams0110
Replying to Warren_Campbell

Who has carried the correction labour into your estimate, Warren? I can't tell whether the new fixture removes it, but I can tell a final acceptance tick doesn't make the person's work free

16 points
WA
Warren_Campbell
Replying to FelixAdams0110

Nobody had. Planner has added an unresolved operation now rather than assigning zero time. I haven't invented a rate from the old batch total.

10 points
EL
EllaBarnes0555
Replying to Warren_Campbell

Does the new layout still leave space for the released check while you investigate? A blank cost line won't preserve its bench.

17 points
WA
Warren_Campbell
Replying to EllaBarnes0555

It did not. Inspection bench was drawn out of the proposal. I've asked the planner to restore its provisional space until the new process is defined.

21 points
AM
AmyAbbott0032
Replying to Warren_Campbell

You can revise that space later with evidence. Much less painful than discovering you need a checking station after everything else has claimed the floor.

19 points
LI
LinCarter0966
Replying to Warren_Campbell

Did the inspector explain the released support arrangement?

4 points
WA
Warren_Campbell
Replying to LinCarter0966

Yes, a sketch is now recorded and being checked against the old part revision. We still have no individually identified measurements from before correction.

17 points
EL
EllaBarnes0555
Replying to Warren_Campbell

Then a current-part study is the next comparison to define. Keep the old sketch as background until quality agrees the method for today's bracket.

6 points
WA
Warren_Campbell
Replying to EllaBarnes0555

Quality and fabrication are planning incoming, released and corrected readings on identified parts. Fixture designer has those open requirements. No result from that study yet.

18 points
FE
FelixAdams0110
Replying to Warren_Campbell

Will somebody who did the old job attend? They might explain the awkward physical bits that never made it into the final sheet, without the team having to treat their old fix as sacred

17 points
WA
Warren_Campbell
Replying to FelixAdams0110

Former operator is invited. Thanks Felix for the labour question; it got planning involved instead of leaving this as a debate about clamp geometry.

11 points
AM
AmyAbbott0032
Replying to Warren_Campbell

Have you got representative current brackets available, including the ordinary variation? One carefully selected sample won't tell the fixture designer much about incoming fit-up.

20 points
WA
Warren_Campbell
Replying to AmyAbbott0032

Fabrication is selecting and identifying them to the agreed study plan. That selection is not complete. I have left fixture approval and any claim about removing correction open.

12 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.