I'm reviewing bracket records for an FR5 welding proposal. One sheet says square in jig. Another says corrected and accepted. Neither identifies the free-state measurement before correction. Worth using these at all?
Same batch, no individual part marks. Drawing C on the inspection sheet. Jig note has no revision. I can't honestly connect a particular correction to that in-jig result.
Toolroom found jig drawing B. It locates the base and one side face. Actual jig has an extra contact absent from B. They've taken that into the review.
And when that contact is assessed, include incoming fit-up and the released drawing-C dimensions in the trial plan, since an in-jig check alone would leave your original question unanswered