I already know the complete tool and setter route belong in these reviews. For this FR10 steel-blank exchange proposal, how should the combined assessment cover the door and transfer sequence before we select the arm?
Use the installed door position and complete held assembly through every relevant phase, with the fixture geometry and human access on the same identified candidate layout
We have an opening width but no parked-door fitting detail, and the finger concept lacks the adapter. I've asked the integrator to reconcile those inputs.
The tool designer is defining the held position for this steel blank. I'll keep the candidate provisional until approach, exchange and return are reviewed with it.