Application safety assessor

JaneAdams0162

Jane Adams

JA
MidlandsJoined 13 Oct 2025165 posts

About

Application safety assessor. Currently exploring maintenance and spare parts. Working around a small commissioning team; planning a 6-week trial before making a decision.

MaintenanceSpare parts

Conversations

H

Handling an aluminum locating sleeve went well. My write-up needs more context. (Fairino FR5, sorted tray loading)

HenryAdams0090 · 26 points · Reviews & comparisons · 3 Sept 2026
14replies
N

Our open machine door is missing from the layout (machine fixture loading)

NadiaAdams0117 · 21 points · Fairino robots · 1 Sept 2026
9replies
A

A robot-presented camera station: What counts as a confirmed defect on a reflective surface?

AnilAli0201 · 27 points · Programming & support · 31 Aug 2026
2replies
A

Should I accept a different kit without seeing it handle our samples? (Universal Robots UR5e)

AmyCarter0989 · 12 points · Applications & integration · 29 Aug 2026
3replies
S

I cannot tell whether our FR10 screen has a value or merely a reply

SamBrown0942 · 8 points · Programming & support · 20 Aug 2026
18replies
F

Seller promised an extra gripper mounting adapter, not just the installed one (Fairino FR10, loading sample trays)

FelixBennett0719 · 16 points · Buying advice · 2 Aug 2026
3replies
I

Damaged UR5e tool-interface cover and a request to switch on

IsaacAdams0172 · 9 points · Buying robots from China · 1 Aug 2026
11replies
L

Our FR10 spacer pickup has acquired a growing collection of nudges

LouisArcher0398 · 3 points · General robotics · 1 Aug 2026
19replies
H

FR10 dispatch pattern needs more than a preferred box direction

HarishAli0228 · 10 points · Applications & integration · 30 Jul 2026
11replies
J

My FR10 stays off while pendant-area freight damage is unassessed

JaneAdams0162 · 27 points · Buying robots from China · 29 Jul 2026
3replies
R

I cannot schedule the 29-blank FR5 proposal from its reachable fixture point

RosaBrooks0814 · 30 points · Fairino robots · 28 Jul 2026
12replies
J

Fairino FR10 pickup drift: fixture, fingers or taught points? - tray loading

JaneAdams0162 · 21 points · General robotics · 21 Jul 2026
0replies
C

Is the grip changing, or am I blaming Universal Robots UR5e too soon? (tray unloading)

CalebArcher0406 · 18 points · General robotics · 15 Jul 2026
7replies
L

A packaged-products warehouse: Which drawings would connect carton support with gripper access?

LucyBennett0741 · 32 points · Applications & integration · 11 Jul 2026
12replies
J

Sample tray station: How do I compare delivered tooling with the agreed sample setup?

JackCarter1037 · 1 points · Applications & integration · 11 Jul 2026
10replies
A

How can a short recording show the package and the agreed task? (Universal Robots UR5e)

AnilArcher0375 · 30 points · Buying advice · 10 Jul 2026
9replies
S

How should our FR10 report reconcile a completion retained through disconnection?

SamChan1116 · 35 points · Applications & integration · 29 Jun 2026
14replies
L

What is missing from this 41-day FR5 sleeve-unloading fault ticket?

LouisAbbott0050 · 9 points · Buying robots from China · 28 Jun 2026
1replies
B

new fr10 SDK response makes a failed read look like a mode

BrunoBaker0452 · 9 points · Programming & support · 22 Jun 2026
21replies
L

Brackets choosing different seats in our tidy FR10 nest

LeoAllen0275 · 23 points · Applications & integration · 22 Jun 2026
12replies