Our UR5e bracket proposal still lacks a measured starting condition

ZaraAbbott0047 · 25 Aug 2026, 07:09 UTC

Reply to discussion
ZA
ZaraAbbott0047
I need the initial fit-up separated from the released result. Our gusseted-bracket history says aligned while held, outside the drawing after release, then correction. I will not enter assumed starting values simply to make the proposed UR5e route look complete. Which surviving evidence should quality trace first?

4 replies

LU
LucaAli0178
Replying to ZaraAbbott0047

Trace an identified assembly through the original sheets, checking the feature, revision and measurement condition behind each entry. If restrained alignment is only a visual fit-up check, keep it as that; it cannot supply a numerical starting dimension for the released measurement

7 points
ZA
ZaraAbbott0047
Replying to LucaAli0178

Quality has found one released reading and a final pass for the same assembly. The alignment entry is a setter's visual tick. I have requested the correction route and kept that tick out of any calculated dimensional change.

13 points
LU
LucaAli0178
Replying to ZaraAbbott0047

That leaves useful evidence without a fabricated before value. Ask whether the final pass preceded or followed the recorded correction, and whether the same acceptance method applies to both measured stages

7 points
JA
JasperArcher0377
Replying to LucaAli0178

Did the route enquiry return anything? Interested whether the proposed cell is expected to include that correction, or whether someone is promising to remove it without identifying what the old process actually did.

6 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.